Skip to content

Lancaster Development: 95% equipment uptime with B2W Maintain

2 Minutes Read
| |

Share this post:

Dan Corbett and his team maintain 500 pieces of heavy equipment for upstate New York highway, bridge and sitework contractor Lancaster Development. In this video, he explains how the move to B2W Track improved preventive maintenance, linked maintenance with field tracking and scheduling and helped drive equipment uptime to 95%.

Related Articles

“Where You Want To Be” - B2W Maintain at D. A. Collins / Kubricky
article

“Where You Want To Be” - B2W Maintain at D. A. Collins / Kubricky

The equipment maintenance team explains how B2W Maintain drives proactive preventive maintenance, up...
Read full article
Coordinate equipment maintenance and utilization with B2W
article

Coordinate equipment maintenance and utilization with B2W

Learn how contractors save money and increase equipment uptime by connecting scheduling/dispatching,...
Read full article
RJV Construction: "We Live and Die by B2W Maintain"
article

RJV Construction: "We Live and Die by B2W Maintain"

Equipment manager Dave Pacella explains how his team has reduced breakdowns, downtime and costs by a...
Read full article