The team at RJV discusses the bottom-line benefits of real-time performance data from the field and a seamless connection between estimating and field tracking with B2W Track and B2W Estimate.
RJV Construction: a correlation between profitability and B2W Track
2 Minutes Read
| August 28, 2019