Full BIM process for all pre-engineered buildings

2 Minutes Read
|

Share this post:

Best of breeds together for better pre-engineered buildings

Introducing a complete solution from design & costing through detailing and fabrication for any kind of metal building (PEB): Integration of the industry leaders – exclusive link between the best solutions.

Optimized design and costing

Get optimal building design with all structural characteristics, materials, codes and loading automatically

  • Least weight optimized from your inventory

  • Flexibility to set design and detailing rules according to company standards

  • Loading conditions automatically defined

  • Complete structural design of primary framing, connections, secondary framing, bracing

  • Complete sheeting, screws, mastic and closures

  • Eliminate human error with software-guided design input

Automatic, accurate and fast costing information

  • Everything needed for a bid

  • Automatic costing calculations with material, labor and overhead pricing

  • Eliminate human errors in costing

Integrated detailing

Import detailed structure with sheeting from MBS into Tekla Structures using the new exclusive link.

Finalize detailing in Tekla with new integrated tools:

  • Stitching – new purpose-built tools for metal buildings to complete detailing

  • Complete detailing of multi material projects

Work efficiently and collaborate with Tekla Model Sharing.

Production and site

  • Automatic drawings for production and erection with new metal building settings

  • Intelligent CNC interfaces to all leading machine vendors

  • Project information sharing with Trimble Connect

Watch video: 

Related Articles

Connecting communities and BIM data on the Stockingfield Footbridge, with Tekla-summary-image
article

Connecting communities and BIM data on the Stockingfield Footbridge, with Tekla

Learn how digital visualization and coordination were essential in constructing the new Stockingfiel...
Read full article
PTDC logistics center project has made extensive use of BIM throughout the supply chain-summary-image
article

PTDC logistics center project has made extensive use of BIM throughout the supply chain

The model enabled us to forecast and manage element deliveries and to check the status in real time,...
Read full article
Tekla utilized to develop geometry and efficiencies for the roof structure of the Singapore Sports Hub-summary-image
article

Tekla utilized to develop geometry and efficiencies for the roof structure of the Singapore Sports Hub

BIM and Tekla software used in modeling of the world’s largest free spanning dome structure, the Sin...
Read full article