Skip to content

Quality assurance that gets it right before the question is asked

2 Minutes Read
|

Share this post:

“Being able to go to the pre-fabrication shops, scan those, take them, look at them in the model and make sure that they’re built right and then make sure that we can get in place as well has been a huge benefit. It helps us answer our questions before we know we have them.”—Chief Field Engineer Josh McShane of Holder Construction

Related Articles

BIM helps to transform Finland’s city of Tampere
article

BIM helps to transform Finland’s city of Tampere

The Best Sports and Recreation Project in the Tekla BIM Awards 2022....
Read full article
Cloud-based insights and processes at Hinkley Point C, with Viewpoint Field View
article

Cloud-based insights and processes at Hinkley Point C, with Viewpoint Field View

Hinkley Point C is the first nuclear power station built in the UK in over 20 years. It is an import...
Read full article
What is a digital twin in construction?
article

What is a digital twin in construction?

Learn how these living digital replicas enhance BIM models with real-time data for smarter decisions...
Read full article