Groupe scolaire Maurice Béjart - Lycée Jean Mermoz project

2 Minutes Read
|

Share this post:

Projet Groupe scolaire Maurice Béjart - Lycée Jean Mermoz

About the project

Category: Fluid Networks Discipline: Heating, Ventilation Teaching establishment: Lycée Jean Mermoz Training: BTS FED - 2nd year Number of academic supervision hours allocated to the project: 120 Team: Romain FAUVEAU, Adrien GRACZYK, Mouad HASNAOUI, Theo BOUILLAGUET Coordinating teacher: Frédéric BLOT

The project in pictures

Projet Groupe scolaire Maurice Béjart - Lycée Jean Mermoz
Projet Groupe scolaire Maurice Béjart - Lycée Jean Mermoz
Projet Groupe scolaire Maurice Béjart - Lycée Jean Mermoz
Projet Groupe scolaire Maurice Béjart - Lycée Jean Mermoz

Trimble products used

Stabicad or Trimble Nova

Project description

Location and presentation :

The Maurice Béjart school complex was built between June 2020 and January 2022 in Juvignac, and comprises three buildings linked by a footbridge.

The project covers an area of 22,000m².

Owner : Ville de Juvignac Contractors : R+4 Architectes, Konbo Architectes, Gaujard Technologie, INGE +, GECKO, OASSIS, DEXO, H & T, Gui JOURDAN, INGECOR, CEAU

The building complies with RT2012 regulations: Bbio<Bbiomax,CEP<CEPmax.

According to the RT2012 average values for the PEC coefficient, this is negative, which means we can save energy thanks to the photovoltaic panels on our roofs. Let's take a look at the main elements used to calculate the RWH coefficient from the thermal study.

The heat is emitted by two different emitters: radiators with a power of 27.6 kW and a water/water heat pump.

The second heating system is a 14.25 kW underfloor heating system.

Ventilation is provided by a single-flow mechanical CMV linked to an Atlantic Critair EC 1000C4 PCI AHU. Ventilation is also provided by a VMC Confort linked to a Hexamotion AHU.

For supply and return air flow during occupancy we have 3125m²/h, and 0m/h when unoccupied.

The project also features an Atlantic Critaire EC 1000 C4 PCI AHU. The second AHU is a Hexa motion double-flow hygienic ventilation system (DF).

Related Articles

Modernizing structural engineering: improved workflows with SketchUp-summary-image
article

Modernizing structural engineering: improved workflows with SketchUp

Revolutionize your structural engineering workflow and cut hours off your modeling process timeline ...
Read full article
11 construction jobs that work (much) better with construction technology-summary-image
article

11 construction jobs that work (much) better with construction technology

Construction tech improves various jobs from executives to field managers. It enhances efficiency, a...
Read full article
Quadri Connector for Civil 3D - connections made easier-summary-image
article

Quadri Connector for Civil 3D - connections made easier

Coordinating data from various software programs is not always easy. In this article, Daniel Alderho...
Read full article