Skip to content
Tags

BIM & 3D Modeling

Sort by
Case study

How digital workflows made large-scale steel reuse possible

Learn how William Hare delivered 77% reclaimed steel on 30 Duke Street using Tekla Structures.
Case study

Building water treatment at scale: RSE’s move to Tekla Structures

Discover how RSE tripled design output and unlocked manufacturing-ready detail with Tekla Structures.
Case study

Case study: Solid Rock Steel achieves first-time fit with Trimble

See how Solid Rock Steel uses Trimble tech to stop expensive jobsite rework before it starts and guarantee first-time fit.
Video

Webinar: Tekla PowerFab 2026i - Deeper Data, Zero Surprises

Tekla PowerFab 2026i brings new precision to how work is tracked across your shop floor, giving you the visibility to catch what's cost...
Document

eBook: The civil contractor’s guide to syncing office and jobsite workflows

Sync office and jobsite workflows to boost productivity and keep civil projects on budget.
Case study

Beyond drawings: pioneering model-only delivery in Eskilstuna

Discover how Sweden’s Trafikverket successfully pioneered a model-only tender for major national infrastructure.
Document

Tekla PowerFab: Connected Steel Fabrication

Connect estimating, detailing and production into one real-time fabrication suite. Eliminate guesswork and reduce errors with Tekla Pow...
Video

Defend your margins: Stop the blame game with ProjectSight 360 Capture

Discover how mechanical contractors use AI-powered 360° capture to document jobsite conditions, defend against back charges and acceler...
External resource

Forging a legacy of innovation

Using an integrated, data-driven workflow, Landmark turned a daunting challenge into a masterclass in efficiency and collaboration.
Case study

Bennett & Pless accelerates project delivery with model-based workflows

Learn how Bennett & Pless accelerated design-to-fabrication by 3-4 weeks using Trimble’s connected, model-based workflows.
Document

The £36bn Question: Is your operation ready for hyperscale?

Learn the requirements for hyperscale data centres, from speed mandates to tech stack prequalification.
Case study

All Things Metal grows business 3X with Tekla PowerFab

Learn how All Things Metal improved visibility across operations and increased productivity with Trimble’s connected solutions and Tekl...
Video

Reducing design and coordination errors in MEP projects

Discover connected MEP workflows that can reduce rework, manual data entry and coordination errors with Trimble StabiCAD. Watch the web...
Document

When scale meets certainty: Engineering India’s next-gen IT park with Tekla Structures

Elematic India used Tekla Structures BIM software to engineer My Home Grava, one of India's largest precast concrete IT parks in Hydera...
Document

Building smarter with BIM: Delivering accuracy and efficiency at Lake Wylie High School

Telge Projects used Tekla Structures to deliver structural steel detailing for Lake Wylie High School in York, South Carolina. The resu...
Document

Raising the world’s tallest precast navigation span: Afcons delivers engineering breakthrough over the Indian Ocean on Tekla Structures

Afcons used Tekla Structures BIM software to engineer the world's tallest precast navigation span segment for the Greater Malé Connecti...
Video

When information flows, profit follows: Close the field-to-office gap with ProjectSight

Stop project delays by closing the gap between field and office. In this webinar, learn to turn site activity into real-time financial ...
Case study

Single source of truth builds strong foundation for construction

Hensel Phelps builds safely with a single source of truth.