Skip to content

Modeling and fabricating a massive, 295,000 sq. ft. East Hangar for United Airlines

Discover how Sanria Engineering delivered 6,400 tons of structural steel detailing for this massive aviation landmark. Using Tekla Structures and BIM/VDC, Sanria managed complex 300-ft clear span box trusses and intricate connection designs.

In collaboration with AECOM Hunt and The Herrick Corp, Sanria resolved structural conflicts 6 months before fabrication, ensuring a seamless erection process. From CNC files to erection drawings, learn about the engineering precision behind one of the world's largest maintenance hangars.

Similar documents

Seeing the big picture with Trimble Unity Construct: Oregon Health & Sciences University
Document

Seeing the big picture with Trimble Unity Construct: Oregon Health & Sciences University

Discover how Oregon Health & Science University streamlined change orders, invoice approvals, and pr...
Read document
Trimble Novapoint civil engineering design brochure
Document

Trimble Novapoint civil engineering design brochure

A successful construction of infrastructure projects, require a detailed, coherent infrastructure mo...
Read document
Tekla PowerFab: Connected Steel Fabrication
Document

Tekla PowerFab: Connected Steel Fabrication

Connect estimating, detailing and production into one real-time fabrication suite. Eliminate guesswo...
Read document