Skip to content

Building smarter with BIM: Delivering accuracy and efficiency at Lake Wylie High School

Telge Projects, a Pune-based BIM partner, used Tekla Structures to deliver structural steel detailing for Lake Wylie High School in York, South Carolina. The large-scale educational facility required complex coordination across wall framing, joist systems and rooftop mechanical units.

Leveraging advanced 3D BIM modeling, clash detection and IFC integration, the Telge team resolved multi-discipline conflicts before fabrication, reducing costly rework. Comprehensive layout drawings and continuous collaboration with the Engineer of Record, architects and MEP teams ensured precision at every phase.

The result: a fully coordinated structural steel model delivered two weeks ahead of schedule, with CNC-ready outputs enabling smooth fabrication and erection. This project demonstrates how BIM-driven workflows improve constructability, accuracy and project efficiency in modern school construction.

Similar documents

Seeing the big picture with Trimble Unity Construct: Oregon Health & Sciences University
Document

Seeing the big picture with Trimble Unity Construct: Oregon Health & Sciences University

Discover how Oregon Health & Science University streamlined change orders, invoice approvals, and pr...
Read document
Reducing capital project risk: lessons learned from Cedars-Sinai
Document

Reducing capital project risk: lessons learned from Cedars-Sinai

Cedars-Sinai automated, standardized and streamlined reports and gained better access and control of...
Read document
Kentucky Transportation Cabinet bridges project
Document

Kentucky Transportation Cabinet bridges project

The Kentucky Transportation Cabinet (KYTC) is responsible for inspecting 14,000 bridges across Kentu...
Read document