Skip to content

Northeastern University: educating our future

Northeastern University’s Facilities Division is responsible:

  • Planning, design and construction of new buildings

  • Extension, renewal and replacement of existing plant facilities

  • Prudent use of energy through the efficient operations of the campus utility distribution systems

The group manages 150-200 capital projects every year that range in cost from $20,000 to $200 million for customers that include the University Board of Directors to the nine individual colleges and schools.

Learn how Northeastern University used Trimble Unity Connect, powered by e-Builder to reduce project cost and shorten their project schedules.

Similar documents

Banner Health scales visibility and budget control with healthcare construction project management
Document

Banner Health scales visibility and budget control with healthcare construction project management

Learn how Banner Health uses PMIS technology to gain visibility and control of its capital program....
Read document
University of Pennsylvania combines sustainable design with historic preservation
Document

University of Pennsylvania combines sustainable design with historic preservation

Learn how the University of Pennsylvania integrated sustainable design into historic campus preserva...
Read document
Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions
Document

Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions

See how the Kentucky Transportation Cabinet uses Trimble's DOT construction project management solut...
Read document