"Eyes" under the water keep Port Otago dredging moving forward

2 minutes read
|
May 17, 2024

Share this post:

Summary

Port Otago uses the Trimble® marine construction system for precise channel dredging, giving operators an underwater "camera" view to ensure accuracy and save on material costs.

Overview

Port Otago is located on the Otago Harbour in New Zealand. It is the island’s primary export port and operates two wharf systems, Port Chalmers and Dunedin, both within Otago Harbour. The port moves over 200,000 TEU (twenty-foot equivalent unit) containers and over 15 million tonnes of conventional cargo every year. Port Otago maintains the longest harbor channel in New Zealand with regular dredging services. The success of these dredging operations has helped increase productivity by allowing larger ships and greater freedom of movement within the channel.

Business challenge

The dredging operation is essential in maintaining a consistent 8 meters (26 feet) through the shipping channel and turning circle. The channel is currently 8 meters deep, with the strategic goal of expanding the port to 10 meters (33 feet) deep. The challenge of rivers feeding sediment and shingle in the harbor, tides and inconsistent seabed depth require guidance for the dredging operators to understand exactly where and when to dredge while preventing the removal of excess material.

Solutions:

Benefits:

  • Dredge accurately and on time: Using Trimble Marine Construction Systems (TMC), the operation is able to return to the exact location they left off at and quickly get back to dredging. With the help of TMC, the fleet can get within 10-20 cm (4 to 8 inches) accuracy and maintain a continuous dredging operation.

  • Real-time visualization: TMC gives operators an underwater 3D image of the operation so they know exactly where to dredge and to what depth via a user-friendly graphical interface using a green and red lines to signify where to dig and where to stop.

  • Maintain dredging resource limitations: The port has limits to maintain resource consents to operate in the Otago Harbour. Over-dredging causes too much material to go out to sea, creating an excessive cost and removing just the required amount of material saves time and efforts of the operation.

  • Project transparency with accurate reporting: As-built dredge data is collected using TMC and project progress reports are created using TBC — HCE. Reports are shared seamlessly via Dropbox.

Accurate and time-saving technology

The team at Port Otago needs to work efficiently and accurately, which is why they rely on Trimble Marine Construction Systems to help them complete their job.

The port and team know the importance of accurately reaching the depth design.

“Having our target reduced level is critical” Leon Snoeck, dredge operator, shared. “If we are over-dredging, we have too much material going out to sea and it is a cost,” he continued. “If we are just removing the material we need to then it is a win-win for the port company.”

Aside from material, Port Otago, has found Trimble Marine Construction Systems to also help with positioning.

“Positioning time is quite significant with a dredging operation, so we don’t want to spend too much time positioning,” Brandt Leeuwenburg shared. The technology has allowed them to make systematically dredge to avoid missing targets or over dredging.

Operator controls a dredge from a cabin, viewing a 3D map of the seabed and the dredge's model, with the machine in water.

Looking at a 3D view of their work underwater

Prior to using TMC, the dredge operation relied on using manual efforts by using tide gauges and putting paint marks around the dipper arm of the digger. Using the technology, they are able to get a view underwater to see the dig, materials and the depth target.

“We can accurately dig to the design depth. No high spots, and we don’t need to stop. Very productive just because of your continuous operation of it. With the system, we can go back to the exact same place that we left the day before,” said Alex Wakefield, dredge master.

A step forward

The technology has helped the port move forward with their strategic goals and dredging maintenance. The team explains that the visuals allow them to dredge accurately and save efforts where they can. The 3D image shown on the ship allows them to position and dredge confidently.

“It’s like having a camera underwater. I am able to get within 10-20 cm (4 to 8 inches) on the seafloor of our target depth. We can dig in one area, and then move across half a bucket and pick-up the spillage and cut at the same time,” Snoeck said.

Changing conditions like tide and shift of materials can make dredging consistently a challenge. “The Trimble system itself calibrates for the tide what our target depth is. It also has a pitch and roll which enables us to set the barge up accurately at any one time,” Snoeck described.

PortOtago3

Easy to use

Operators at the port all shared the ease of use with the Trimble Marine Construction System. They found it was easy to learn and never had any issues or problems arise during their digs. This makes project completion time to be on target and allows operators to confidently dredge.

“It just runs. We turn it on in the morning and we don’t have any major issues, a few little learning curves, but we are all brand new with the software too. But good support through SITECH,” Leeuwenburg shared. “We haven’t had any major issues.” he continued.

“Navigating around the Trimble system, it’s really user-friendly, even for people who aren’t computer savvy, it is very easy to pick up. Such a tool that I am used to now, that I wouldn’t want to go back without it,” Snoeck explained.

Trimble has a range of solutions for dredging, placement and hydrographic surveying; visit trimble.com/marine to learn more.

Related case studies

Perfecting the design-to-construction workflow on one of America's largest P3 projects
Case study

Perfecting the design-to-construction workflow on one of America's largest P3 projects

On a massive 30-mile stormwater diversion channel project, ASN Constructors used a fully connected T...
Read full article
Gartell & Son uses Trimble ProPoint for reliable operation in GNSS conditions where signal typically fails
Case study

Gartell & Son uses Trimble ProPoint for reliable operation in GNSS conditions where signal typically fails

UK contractor Gartell & Son solved poor GNSS reception on a jobsite by using Trimble® Earthworks wit...
Read full article
Stutsman-Gerbaz digs in to subscription-based construction technology
Case study

Stutsman-Gerbaz digs in to subscription-based construction technology

The Trimble® Works Plus subscription helped contractor Stutsman-Gerbaz affordably outfit its fleet w...
Read full article
Attention

We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.

Cart updated
Some items in your cart are not available for purchase in your region, so we removed them. Please review your cart before proceeding.

Items Removed:
Attention

The software you are trying to purchase is not available in your country or region.

Cart updated
The items in your cart have been updated for two reasons. Firstly, the prices now match the currency linked to your account address. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for two reasons. Firstly, you've added too many of one item to your cart. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for three reasons. Firstly, the prices now match the currency linked to your account address. Secondly, you've added too many of one item to your cart. Thirdly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding

Items Removed:
Cart updated

Your currency has been changed to match the currency associated with your account address.

Cart updated

Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.

Cart updated

While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.

Attention

We were unable to access your account information. Please contact customer support for assistance.

Attention
Unable to update shopping cart information. Please refresh the page to resolve the issue. If this issue persists, please contact Trimble support.
© 2026 Trimble Inc.

Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.