Northeastern University’s Facilities Division is responsible:

  • Planning, design and construction of new buildings

  • Extension, renewal and replacement of existing plant facilities

  • Prudent use of energy through the efficient operations of the campus utility distribution systems

The group manages 150-200 capital projects every year that range in cost from $20,000 to $200 million for customers that include the University Board of Directors to the nine individual colleges and schools.

Learn how Northeastern University used Trimble Unity Connect, powered by e-Builder to reduce project cost and shorten their project schedules.

Similar documents

ProjectSight, solution de gestion de projets fiche produit
Document

ProjectSight, solution de gestion de projets fiche produit

La solution Trimble® ProjectSight® met la gestion numérique de projets à la portée de tous les profe...
Lire le document
eBook : Adoptez une nouvelle façon d'acquérir des technologies de construction avec Trimble Works
Document

eBook : Adoptez une nouvelle façon d'acquérir des technologies de construction avec Trimble Works

Un abonnement à Trimble Works permet d'améliorer la productivité et la rentabilité. Cet ebook présen...
Lire le document
Trimble Connect, plateforme collaborative BIM brochure
Document

Trimble Connect, plateforme collaborative BIM brochure

Un accès en temps réel aux informations du projet de construction. Trimble Connect est une plateform...
Lire le document