Skip to content

The Power of Estimating with Work Breakdown Structures (WBS)

Do you wish there was an easier way to bid construction jobs using CSI MasterFormat™ or even your own custom work breakdown structure (WBS)? Well now there is with B2W Estimate! In this 45-minute webinar, watch a B2W Solutions Engineer show you exactly how you can estimate the job the way you would build it.

Similar resources

resource

Episode 4: Digital design and delivery for bridge and infrastructure [Full]

Watch episode 4. Learn how parametric and BIM modelling tools have been used to design and deliver 13 major road and rail infrastructure projects. A streamlined process helped reduce risk + save time!
Watch now
resource

Spotlight on public bidding: Leveraging Trimble Unity Construct

Learn how Trimble Unity Construct transforms the public bidding process with expert insights from public sector leaders.
Watch now
resource

Migrating to Trimble Unity with confidence: Lessons from real implementations

Explore key migration pathways and expert lessons for transitioning your infrastructure workflows to Trimble Unity.
Watch now