Skip to content
JE Dunn construction team reviewing a digital model on-site, discussing layout and coordination.
The JE Dunn way

Turning planning into precision

At JE Dunn, connected technology drives streamlined workflows, scalable standardization, and empowered teams. This is how excellence becomes repeatable, one turn at a time.

Driven by Data

Nothing left to chance

With data-backed decisions and streamlined systems, JE Dunn moves fast and builds smarter, setting a new benchmark for success. Explore four ways they’re using Trimble technology to deliver exceptional results.

National processes
Standardized processes, designed to adapt to local challenges.
Empowered teams
Technology that overcomes daily obstacles and helps to attract and retain the best talent.
Smart sustainability
Accurate data and smart planning, leading to less waste and rework.
Predictable precision
Efficiency and precision working in parallel to deliver with confidence.
On-Site: Austin & KC

The JE Dunn way in action

A bird’s-eye view of how JE Dunn turns process into excellence.

Process supported by results

Measurable results

From faster builds to smarter sustainability, these results show how Trimble technology enables JE Dunn to turn process into performance.

Reduced Rework

$1.6M
Rework associated with concrete layout dropped from $2.1M in 2022 to $500,000 in 2024, with zero layout related rework year to date in 2025.
99%+ accuracy
300 steel embeds placed using Tekla & FieldLink, with only 2 misplaced.

Rapid Precision

50% faster
When utilizing model based layout, and excavation planning with machine control.
4x faster
Turnover speed improved using integrated model-to-layout workflows.

More with Less

22%
Less concrete used than what was estimated after verified placement results.
27%
Reduction in carbon emissions - the environmental equivalent of reforesting 648 acres or powering 86 homes for a year.
A Closer Look

Redefining what’s possible

JE Dunn makes every project a model of excellence. Watch below to see how they tackle construction’s toughest challenges.

Discover how JE Dunn standardizes self-perform workflows to reduce rework, boost productivity, and deliver consistent results, so every concrete pour, from Austin to Kansas City, follows the same proven process.

Two JE Dunn employees performing a concrete pour from scaffolding on a jobsite in Austin, Texas, demonstrating standardized national processes.
Testimonials

Real voices, real impact

Read more about how JE Dunn leverages data and technology.

Attention
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
Cart Updated
undefined

undefined:
undefined
Attention
The software you are trying to purchase is not available in your country or region.
Cart Updated
The items in your cart have been updated for two reasons. Firstly, the prices now match the currency linked to your account address. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

undefined:
undefined
Cart Updated
The items in your cart have been updated for two reasons. Firstly, you've added too many of one item to your cart. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

undefined:
undefined
Cart Updated
The items in your cart have been updated for three reasons. Firstly, the prices now match the currency linked to your account address. Secondly, you've added too many of one item to your cart. Thirdly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding

undefined:
undefined
Cart Updated
Your currency has been changed to match the currency associated with your account address.
Cart Updated
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
Cart Updated
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.