Skip to content

Villager Construction: a full picture of field performance with B2W Track

2 minute read
| |
December 8, 2023

Share this post:

Replacing a chaotic mix of paper- and spreadsheet-based field tracking processes gave this contractor uniformity, a full picture of job performance daily and a vital estimating-tracking connection.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

Santiago Bernabeu Stadium renovation project

This new fixed roof, with more than 9,000 tons of steel, consists of two 177-meter-long trusses span...
Read full article
Article

The tallest building in SEA built with Tekla and Trimble

Coteccons achieved a milestone with the Landmark 81 project, this project has proved the clear benef...
Read full article