Skip to content

Quality assurance that gets it right before the question is asked

2 minute read
|
January 27, 2025

Share this post:

“Being able to go to the pre-fabrication shops, scan those, take them, look at them in the model and make sure that they’re built right and then make sure that we can get in place as well has been a huge benefit. It helps us answer our questions before we know we have them.”—Chief Field Engineer Josh McShane of Holder Construction

Related articles

Article

Santiago Bernabeu Stadium renovation project

This new fixed roof, with more than 9,000 tons of steel, consists of two 177-meter-long trusses span...
Read full article
Article

The tallest building in SEA built with Tekla and Trimble

Coteccons achieved a milestone with the Landmark 81 project, this project has proved the clear benef...
Read full article
Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article