Skip to content

PIERS - ENGINEERING ELEMENTS

2 minutes read
|
March 19, 2024

Share this post:

Trimble Construction Awards - Eléments Ingenièrie, Les Jetées

About the project

Category: Commercial HVAC - Elec. Company: ÉLÉMENTS INGENIÉRIE Project location: HUNINGUE (Haut-Rhin), France Client: Constructa Promotion Architect: Nicolas Laine Architecte

The project in pictures

Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées

The project in figures

Surface area: 5065 m2 Cost of works excluding VAT: €25 M

Trimble products used

Stabicad Trimble Connect

Project description

This project involves the construction of a coliving building, part of a real estate complex called "Les Jetées". It will be built as part of the Rhine banks development project in Huningue.

Their architectural ambitions and the resonance between exterior and interior spaces call for in-depth thermal studies. This was done in close collaboration with the structural design office, given the constraints of seismic zone 3.

Our design office was responsible for 2 separate work packages for Building C: the HVAC and smoke control work package, and the plumbing and sanitary work package. This included the design and sizing of the ventilation and smoke extraction networks, as well as the drinking water supply networks (hot, loop and cold water), and the drainage networks.

Challenges to meet

  • ERP in the middle of the building (sauna and sports hall), implying compliance with different standards within the same project.

  • Hybridization of heat production

  • Thermal studies RT2012 -20% discount

  • Ground-floor retail outlets, involving substantial extraction ducts

Main role of ÉLÉMENTS INGENIÉRIE

Design office with supervision of execution

Related articles

Article

5 benefits of GIS-Centric asset management for urban forestry

Trimble Cityworks provides a GIS-centric asset management system that enables cities to start, manag...
Read full article
Article

Agentic AI: a foundation for physical industries

Just as electricity powers entire cities rather than lightbulbs alone, AI is evolving from simple ch...
Read full article
Article

AI change management: empowering people first

AI adoption starts by empowering your team. By automating repetitive tasks, organizations elevate em...
Read full article
Attention

We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.

Cart updated
Some items in your cart are not available for purchase in your region, so we removed them. Please review your cart before proceeding.

Items Removed:
Attention

The software you are trying to purchase is not available in your country or region.

Cart updated
The items in your cart have been updated for two reasons. Firstly, the prices now match the currency linked to your account address. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for two reasons. Firstly, you've added too many of one item to your cart. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for three reasons. Firstly, the prices now match the currency linked to your account address. Secondly, you've added too many of one item to your cart. Thirdly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding

Items Removed:
Cart updated

Your currency has been changed to match the currency associated with your account address.

Cart updated

Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.

Cart updated

While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.

Attention

We were unable to access your account information. Please contact customer support for assistance.

Attention
Unable to update shopping cart information. Please refresh the page to resolve the issue. If this issue persists, please contact Trimble support.
© 2026 Trimble Inc.

Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.