About the project
Category: Infrastructure project Company: OMS Project location: L'HERMITAGE RENNES, France
The project in pictures
















The project in figures
Dimensions: 40-metre span / 5-metre width Steel weight: 50 tonnes Night craneage over SNCF tracks using a 700-tonne crane
Trimble products used
Tekla Structures
Project description
A pedestrian-cyclist footbridge providing safe access to the town center, train station, schools, services and new neighborhoods.
This footbridge spans the railroad line.
Challenges to meet
Linking architectural constraints with constraints linked to structural calculations / constraints linked to production and installation of the footbridge.
Modelling technology (bending, rolling, 40mm-thick strip elements) / workshop technology Fully welded elements (2 longitudinal parts assembled on site before lifting)
OMS's main role
Builder / Manufacturer