About the project
Category: Sport and Leisure Project Company: SODRAMEC Project Location: ARCEY, France
The project in pictures














The project in figures
Total weight of site: 400 Tons Weight of screening station and hoppers: 200 Tons
Trimble products used
Tekla Structures Trimble Connect
Project description
Realization of an aggregate processing plant by crushing and screening. The model shown covers the screening station and the hoppers for storing the finished products.
Due to the lack of space in the quarry, it was decided to place the screening station above the in-line hoppers.
Materials are stored by gravity. Because of winter weather conditions, the 2 screens that make up the screening station are placed under frameworks with a roof and cladding.
Challenges to meet
Project size relative to company size.
Project phasing for manufacturing and assembly organization
Using Trimble Connect on the job site
Using Tekla Structures macros to define assemblies
SODRAMEC's main role
Builder / Manufacturer