About the project
Company: SUD ETUDES ET EQUIPEMENTS INDUSTRIE Project location: MARSEILLE 13008, France
The project in pictures


















The project in figures
Cost of marine works: 6.9 million euros Total surface area of project: 49,000 m² North quay surface: 350 m² Inner breakwater: 750 m² Pôle France boom: 45 m² Concrete volume: 630 m3 Weight of reinforcement: 80 Tons
Trimble products used
Tekla Structures Tekla Model Sharing
Project description
Marina of the nautical stadium for the 2024 Olympics in Marseille.
Challenges to meet
The challenge of this project was to design a prefabricated structure on offshore piles, interfacing with the existing quay.
Assembly of the prefabricated parts went very smoothly on site.
We studied the prefabricated structures and 3D reinforcement on Tekla Structures.
Main role of SUD ETUDES ET EQUIPEMENTS INDUSTRIE
Design office during the execution phase