About the project
Category: Industrial Project Company: SUD ETUDES ET EQUIPEMENTS INDUSTRIE Project Location: AIRVAULT, France
The project in pictures








The project in figures
Length of longest conveyor: 175 metres Maximum height: 60 metres Tonnage: 695 tonnes Quantity of concrete: 683 m3
Trimble products used
Tekla Structures Tekla Model Sharing
Project description
The aim of the project is to build a state-of-the-art cement plant on a European scale, increasing yields while greatly reducing the carbon footprint (by 27%).
Our study concerns three conveyors used to transport clinker in a cement plant, and a building used to support incinerated silos (reinforced concrete and steel structure).
Challenges to meet
The biggest challenge was to design conveyors with significant overhangs so as not to add loads to the existing storage silos, with strict constraints on displacements for the mechanical conveyors supported by our structures.
Main role of SUD ETUDES ET EQUIPEMENTS INDUSTRIE
Design office during the execution phase